News Center
The correct wiring method for leakage protectors
2024-07-23
Summary: Install the back cover and tighten the screws
1. First, open the back cover and loosen the screws on the copper terminal as much as possible;
2. Press the stripped power cord onto the terminal block or immerse it in tin, and follow the instructions below to place it under the terminal block:
Explanation: The live wire (L) is usually a brown wire
The neutral line (N) is usually blue
The ground wire (E) is generally yellow green in color
3. Tighten the terminal screws and tighten the wires tightly;
4. Install the back cover and tighten the screws;
Next
Next
RELATED INFORMATION